The Scow Build Process in Pictures - 8/11
|
|
The tank tops of the bow and stern tanks, and the centre panel of the mid tank top have been fitted. Bearers have been fitted to bulkheads C and D and to the side shell sheer doublers to support the sloping sides of the tank top.
|